Applying patch on a modified form.

February 19th, 2015 1 comment

 

  1. Read the cover letter, highlights forms that have been modified, and Sps that have EXTGEN on.

  2. For EXTGEN SPs, will need to manually apply the new changes.

  3. For modified Forms, make a backup of the Form scripts use FormSync.

  4. Apply the patch to unused configuration, such as Demo.

  5. Merge the new vendor version of form from Demo to target configuration, form by form.

    1. Start FormSync with

    2. Filter with single form.

    3. Do not apply change to any other objects.

    4. Keep other object unchanged.

Remember to uncheck all the filters here.

  1. Run Synchronization

  1. Test the newly merged, modified form.  May need to work out conflict if there is any.

Categories: Application Tags: , ,

Some notes on Job Planned Cost

February 19th, 2015 No comments

1) The “Job BOM Cost Roll Up” utility and the “Update Planned Cost” button in Job form, Cost Detail tab are pretty much doing the same thing, they will update the material cost in job material.

ScreenHunter_04 Feb. 19 09.33

 

 

 

 

 

 

ScreenHunter_05 Feb. 19 09.38

 

2) Syteline system didn’t maintain a field for total job planned cost, you have to run job costing reports like “Job Cost Various Report” to see the total planned cost.

3) Job BOM Cost Roll Up use the item Unit Cost, and Current BOM Cost Roll Up use item Current Unit Cost.  So even you just copy the Job BOM from Current BOM, the current cost of job item may be differ than the job planned cost.

4) Cost roll up utilities rely on Unit Cost and Current Unit Cost maintained in Item Cost.  For a new item, say it is a purchase item, Syteline system would not assign Unit Cost and Current Unit Cost, until you conduct the first inventory transaction for the item (the transaction can be a PO receive, a Job complete receive or Misc receipt).   So your job material plan cost would not include these new materials.  Even you create a PO for the new item, system would not save the PO cost back into item cost, until you actually receive that PO.   However, for a new item, with or without a PO, you can use Item Cost form, Cost Maint tab to assign initial Unit Cost and Current Unit Cost.

Inline image 2

You will see that the Unit Cost fields are open for edit for this new item.  Once you conduct a receiving transaction and has qty on hand, the Unit Cost fields are No Longer editable.  It will be maintained by the system.
Note 1: these initial unit costs and current unit costs will have no effect on your inventory as you have qty-on-hand of 0.  These purely just for your job plan cost.
So for a new purchase item, it is suggested that you a) setup vendor contract price, b) setup initial unit cost and current unit cost in item cost maintenance, c) do cost roll up.
5) There is checkbox in PO line form, called “Update Job Material Unit Cost”, this only works for cross-referenced job material.  It will update the job material cost, when the PO cost change.